Backload of 8-point Anchor system onto SKANDI HERA for return to Norway . This was the anchor system used on the Zafiro Producer while at anchorage in LUBA BAY
Related items
1 Million Man-Hours without Lost Time Incident (LTI)
Safety Award Ceremony for 1 Million Man-Hours without Lost Time Incident (LTI), presided o
Trident Energy’s supply vessels, quayside at Luba Freeport for loading operations,
Trident Energy’s supply vessels, quayside at Luba Freeport for loading operations, prior t
Borr Drilling’s jack-up “GERD” at anchor in Luba
Borr Drilling’s jack-up “GERD” at anchor in Luba Bay since the end of July 2023.Was loaded