Trident Energy’s supply vessels, quayside at Luba Freeport for loading operations, prior to the arrival of Drill Ship “Noble Venturer” around 29th June to start their drilling campaign. Trident anticipates the campaign to last until approximately end of November.
Related items
The H.L.V. Seaway Hawk is offloading rigs for Shelf Drilling
The H.L.V. Seaway Hawk is offloading rigs for Shelf Drilling in Luba Bay prior to towing t
1 Million Man-Hours without Lost Time Incident (LTI)
Safety Award Ceremony for 1 Million Man-Hours without Lost Time Incident (LTI), presided o
Borr Drilling’s jack-up “GERD” at anchor in Luba
Borr Drilling’s jack-up “GERD” at anchor in Luba Bay since the end of July 2023.Was loaded